Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 29 results ...

Abdenour, J I (2021) A cost estimation model for improving the budget estimates of industrial plant construction projects, Unpublished PhD Thesis, , The George Washington University.

Adoko, M T (2016) Developing a cost overrun predictive model for complex systems development projects, Unpublished PhD Thesis, , The George Washington University.

Alves, L F (2006) Stochastic approach to risk assessment of project finance structures under public private partnerships, Unpublished PhD Thesis, , The George Washington University.

Bersson, T F (2012) A framework for application of system engineering process models to sustainable design of high performance buildings, Unpublished PhD Thesis, , George Washington University.

Boyer, E J (2012) Building capacity for cross-sector collaboration: How transportation agencies develop skills and systems to manage public-private partnerships, Unpublished PhD Thesis, , The George Washington University.

Charoenphol, D (2017) Using robust statistical methodology to evaluate the performance of project delivery systems: A case study of horizontal construction, Unpublished PhD Thesis, , George Washington University.

Cho, S (2000) Sequential estimation and decision-making in project management: A Bayesian way and heuristic approaches, Unpublished PhD Thesis, , The George Washington University.

Elsherbiny, A (2021) Prediction of design error rework cost in EPC industrial projects, Unpublished PhD Thesis, , George Washington University.

Farmer, C M (2018) Constructing program management offices for major defense acquisition programs: Factors to consider, Unpublished PhD Thesis, , The George Washington University.

Griffin, M G (2008) The lived experience of first line managers during planned organizational change: A phenomenological study of one firm in the residential construction industry, Unpublished PhD Thesis, , The George Washington University.

Holmlin, R M (2016) Pre-design methodology for establishing scope-budget and scope-duration alignment for capital projects, Unpublished PhD Thesis, , George Washington University.

  • Type: Thesis
  • Keywords: accuracy; duration; project team; cost management; design cost; estimating; project cost; designer; United States
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/1814746517
  • Abstract:
    It is well established that projects do not meet their cost, schedule and scope objectives and often fail to deliver the benefits that were hoped for. Part of the challenge is that at the conceptual/pre-design stage, the level of scope definition is often only 1-2% and the resulting pre-design cost estimates typically have an accuracy range of -50% to +100%. Project teams may not feel confident providing this information to the designers as design-to-cost targets and overall project cost management suffers as a result. The proposed methodology was developed to assist with pre-design estimating on a new student health center at a college in the mid-Atlantic region of the United States. Development of a preliminary work breakdown structure allowed development of a cost model targeted at the major cost elements of a capital project by removing cost elements such as sitework and general conditions that have greater variability that is often concealed in cost/SF historical data used for modeling. The regression equation developed, based on five data points of comparable projects ranging in size from 20,000SF to 72,714 SF , with a zero intercept, has an R2 of 0. 9925, a P Value <0. 0001 and a F test score of 661. 63. 63. Using the model to validate the cost of the comparable projects resulted in a cost forecast range of -10. 3% to + 39. 4% as compared to industry standard expected cost range in the pre-design period of -50% to+100%. Using the forecast cost and Bromilow equations to forecast project duration resulted in duration forecasts within approximately +/-18% of the contracted durations. The need for vigorous cost management over the life of a project remains, but this methodology offers an approach to (1) develop design-to-cost targets and (2) for the project team to have greater confidence they have scope-budget and scope-duration matches as the project enters design.

Innocent, M J F, Jr. (2018) Predicting military construction project time outcomes using data analytics, Unpublished PhD Thesis, , The George Washington University.

Joao, Z R (2021) Road construction assessment model (RC-AM) to prevent contract overbilling in Angola, Unpublished PhD Thesis, , George Washington University.

Kim, E (2000) A study on the effective implementation of earned value management methodology, Unpublished PhD Thesis, , The George Washington University.

Krone, S J (1991) Decreasing the impact of changes, Unpublished PhD Thesis, , George Washington University.

Lounsbury, C R (1983) From craft to industry: The building process in North Carolina in the nineteenth century, Unpublished PhD Thesis, , The George Washington University.

McDavid, H A (1996) Construction and economic development: A stimulus or constraint in developing countries, Unpublished PhD Thesis, , George Washington University.

Momtazi, S (2021) Reducing cost overruns in construction projects using lean methodology, Unpublished PhD Thesis, , George Washington University.

Ngamthampunpol, D (2008) An assessment of safety management in the Thai construction industry, Unpublished PhD Thesis, , The George Washington University.

Park, J (2015) Essays on the delivery of public infrastructure projects: Empirical analyses on transportation projects in Florida, Unpublished PhD Thesis, , The George Washington University.

Reid, J S (2019) Evaluating the impact of using agile methodologies in heavy-civil construction, Unpublished PhD Thesis, , George Washington University.

Schulte, W D, Jr. (1999) The effect of international corporate strategies and information and communication technologies on competitive advantage and firm performance: An exploratory study of the international engineering, procurement and construction (IEPC) industry, Unpublished PhD Thesis, , The George Washington University.

Shamma, E M (1988) A dynamic model for the growth of construction firms, Unpublished PhD Thesis, , The George Washington University.

Stuban, S M F (2011) Employing risk management to control military construction costs, Unpublished PhD Thesis, , George Washington University.

Taku, A M (2021) Predicting modular efficiency in oil and gas capital projects using multi-criteria decision analysis, Unpublished PhD Thesis, , The George Washington University.

Toliver, B L (2018) Implementing project management plans to control construction costs on military projects in Korea, Unpublished PhD Thesis, , George Washington University.

Tonimoghadam, F (2021) A predictive model for reducing cost and time for the detection of clashes in residential and commercial constructions projects, Unpublished PhD Thesis, , George Washington University.

Wenzelberger, J P (1987) The economic analysis of tall buildings (Milwaukee, Wisconsin; Boston, Massachusetts; Kansas City, Missouri), Unpublished PhD Thesis, , George Washington University.

Zhou, G (2021) Machine learning-based cost predictive model for better operating expenditure estimations of U.S. light rail transit projects, Unpublished PhD Thesis, , The George Washington University.